Registers and boards

A register is the single list of one kind of object, such as risks or change requests. Show it as a board or as a list.

This page applies to every stage.

IDK templates: IDK-04, IDK-07, IDK-10, IDK-13

Page in the app: /p/{projectId}/r/{type}

Every card moves the same way

The real status names depend on the object type.

  1. Open
  2. In progress
  3. Waiting for approval
  4. Done

How to do it

  1. Pick a view. Use Board to see the flow. Use List to sort, filter and search.
  2. Open a card. The side panel shows fields, links, files and history.
  3. Move it. Drag the card or use the action button. Both do the same thing and both are logged.
  4. Load a list. Where the register allows it, select Import to load a CSV file. See the import topic.

Good to know

  • A move can be refused. The message tells you which field or approval is missing.
  • You cannot skip a status. The flow is part of the method.

Related topics

Based on the IFS Implementation Docs Kit (IDK-01 to IDK-24), described in our own words.

Last updated: