Import a register from CSV

Load a list you already keep in Excel into a register. Nothing is saved until you confirm the last step.

This page applies to every stage.

Four steps

Start in the register and select Import.

  1. File. Choose a CSV file.
  2. Columns. Map each column to a field.
  3. Check. Read the result for every row.
  4. Done. The rows are created.

How to do it

  1. Save the sheet as CSV. Use UTF-8 or Windows-1250. Excel files are not accepted. Separators can be a semicolon, a comma or a tab.
  2. Map the columns. Choose the field for each column. Columns you leave out are not imported. Fill every required field.
  3. Check the result. Each row is ready, a duplicate or an error. Download the list of errors, or skip the rows with errors.
  4. Confirm. Select Import. Every row is created in the first state of the register and moves on through the usual actions.

Good to know

  • A duplicate is a row whose title is already in the register. You choose to skip or create it.
  • The same file cannot be imported twice into the same register.
  • Registers with personal data, and fields that a text cell cannot fill, cannot be imported.
  • Every created row is written to the audit log with the source import.

Related topics

Based on the IFS Implementation Docs Kit (IDK-01 to IDK-24), described in our own words.

Last updated: