Defects
A defect is a fault found in testing. Log it, rate its severity and follow it until it is fixed and checked.
This page applies to the Establish solution stage.
Page in the app: /p/{projectId}/r/defect
How to do it
- Log it. Say what failed and how to repeat it. Link the test run, CRIM or interface.
- Rate it. Choose a severity: critical, major, minor or cosmetic.
- Resolve. Write the resolution and where it is fixed.
- Check it. Record the date and a note when the fix was verified.
Good to know
- Defects are also created for you when a CRIM or interface fails its test.
- A closed, deferred or rejected defect is frozen. Reopen it to change it.
- Defer and reject need a reason.