Testing

Test cycles, scenarios, runs and defects. Ends with the acceptance test (SAT) and the operational readiness test (ORT).

This page applies to the Establish solution stage.

IDK templates: IDK-17, IDK-18

Page in the app: /p/{projectId}/testing

A test cycle

SAT proves the solution works. ORT proves the company can run it.

  1. Entry criteria. Is the build ready to test?
  2. Run scenarios. Testers follow the steps and record results.
  3. Fix defects. Retest what failed.
  4. Exit criteria. Close the cycle with a clear verdict.

How to do it

  1. Plan the cycle. Set the type, window and environment.
  2. Write scenarios. Add steps and expected results.
  3. Run and log. Record every run. Log defects with a severity.

Related topics

Based on the IFS Implementation Docs Kit (IDK-01 to IDK-24), described in our own words.

Last updated: