My profile
Connect your Microsoft 365 calendar so Implementer can find a free time for meetings, and create tokens for Excel and Power BI. Both are optional.
This page applies to the System and project configuration stage.
Page in the app: /profile
How to do it
- Connect. Select Connect. Microsoft asks you to allow the access, then brings you back here.
- Check the status. Connected means it works. If it says reconnect needed, select Reconnect and allow the access again.
- Disconnect. Select Disconnect and confirm. Implementer stops using your calendar at once.
- Create a feed token. In the feed section type a name and select Create token. Copy the token at once. It is shown only one time.
- Connect Excel or Power BI. Paste the feed address, choose Basic sign-in, and use the token as the password.
- Revoke a token. Select Revoke next to a token and confirm. Anything that uses it stops working.
Good to know
- If the calendar section is missing, your administrator has not switched calendar access on.
- The feed section shows only if you may read project data through the feed. If it says the feed is off, ask an administrator.
Related topics
Based on the IFS Implementation Docs Kit (IDK-01 to IDK-24), described in our own words.
Last updated: