Notifications

Choose how you are told about approvals, gates and other events. Project administrators set the channels of the project.

This page applies to the System and project configuration stage.

Page in the app: /p/{projectId}/settings/notifications

Who decides what you get

Each step can only narrow the one before it.

  1. Methodology. It lists the topics and the channels each may use.
  2. Project. An administrator can switch channels off for the project.
  3. You. You pick channels, digests and quiet hours.

How to do it

  1. Open the bell. Unread items are in bold. Select one to open it.
  2. Pick your channels. Tick a channel for each topic. Required topics stay on.
  3. Set quiet hours. Choose the hours and your time zone.
  4. Check the delivery log. Administrators see messages that could not be sent.

Good to know

  • A message that failed every retry is shown as dead. Fix the cause, such as the mail server settings.

Related topics

Based on the IFS Implementation Docs Kit (IDK-01 to IDK-24), described in our own words.

Last updated: