Administration

System settings for the whole installation: sign-in, storage, AI, IFS connections and the methodology packs.

This page applies to the System and project configuration stage.

Page in the app: /admin

What an admin looks after

Secrets are never shown after you save them.

  1. Access.
    • Sign-in
    • Roles
  2. Connections.
    • IFS read-only link
    • Mail
    • AI model
  3. Health.
    • System status
    • Error log
    • Licence

How to do it

  1. Change a setting. Edit, test the connection, then save.
  2. See history. Each setting keeps its change history.
  3. Restart if asked. A banner tells you when a restart is needed.

Good to know

  • The IFS connection can only read. The app does not change IFS Cloud.
  • Backups are taken on the host with implementer-ctl, not in this application.

Related topics

Based on the IFS Implementation Docs Kit (IDK-01 to IDK-24), described in our own words.

Last updated: