# Administration

System settings for the whole installation: sign-in, storage, AI, IFS connections and the methodology packs.

This page applies to the System and project configuration stage.

Page in the app: `/admin`

## What an admin looks after

Secrets are never shown after you save them.

1. **Access.**
    - Sign-in
    - Roles
2. **Connections.**
    - IFS read-only link
    - Mail
    - AI model
3. **Health.**
    - System status
    - Error log
    - Licence

## How to do it

1. **Change a setting.** Edit, test the connection, then save.
2. **See history.** Each setting keeps its change history.
3. **Restart if asked.** A banner tells you when a restart is needed.

## Good to know

- The IFS connection can only read. The app does not change IFS Cloud.
- Backups are taken on the host with implementer-ctl, not in this application.

## Related topics

- [Methodology pack upgrade](https://implementer.ifs-erp.com/help/en/pack-upgrade.md)
- [Audit log](https://implementer.ifs-erp.com/help/en/audit.md)
- [Licence](https://implementer.ifs-erp.com/help/en/admin.licence.md)
- [Error log](https://implementer.ifs-erp.com/help/en/admin.errors.md)
- [API tokens](https://implementer.ifs-erp.com/help/en/api-tokens.md)

Based on the IFS Implementation Docs Kit (IDK-01 to IDK-24), described in our own words.

Last updated: 13 November 2026
